Skip to main content
Conference Proceedings

The AusIMM Proceedings 1952

Conference Proceedings

The AusIMM Proceedings 1952

PDF Add to cart

Mining Methods at Mount Morgan Limited

This paper gives a general description of mining operations at the Mount Morgan Open Cut. Certain features such as blast hole diamond drilling, which may be of particular interest, have been described in detail. The paper is covered by the following headings:-1. History2. Ore Reserves and Production Data3. Mining Methodsa. Design and Layout of the Open Cut.b. Overburden and Ore Breaking.c. Loading and Transport of Ore and Overburden.d. Transport of Men and Supplies.e. Survey and Assay.f. Drainage.4. Power and Compressed Air5. Mining Equipmenta. Shovels.b. Mine Transport.c. Dozer Tractors.d. Drill Shop.6. CostsHISTORYIn order to appreciate fully the design of the present Open Cut at Mount Morgan, a brief outline of the Mine's history and past mining methods is necessary. In 1882 the Mount Morgan Syndicate began to mine this large gold-copper orebody by small hill-top quarries...
Return to parent product
  • Mining Methods at Mount Morgan Limited
    PDF
    This product is exclusive to Digital library subscription
  • Mining Methods at Mount Morgan Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1951
  • PDF Size: 3.06 Mb.
  • Unique ID: P_PROC1952_0715

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.