Skip to main content
Conference Proceedings

The AusIMM Proceedings 1955

Conference Proceedings

The AusIMM Proceedings 1955

PDF Add to cart

The Mineral Composition of Ore from the Hill 50 Gold Mine, Western Australia

Ore from the Hill 50 Gold Mine, consists essentially of pyrrhotite, with minor amounts of pyrite, chalcopyrite, galena and gold, replacing "jaspilite." The gold is associated with the sulphides as shotty particles. About 8 per cent. of the particles are less than '0.010'mm.The Hill 50 Gold Mine, at Boogardie in the Murchison goldfield, about 300 miles north-west of Kalgoorlie, was first operated in 1898. From 1898 to 1917 it yielded 20,000 short tons of ore for a recovery of 6,225' fine oz. gold, equivalent to a recovery grade of 6.22 dwt. gold per ton.The present company since the beginning of its operations in September 1936 to June 30, 1954, produced 811,081 short tons of ore for a recovery of 242,554 fine oz. of gold, equivalent to a recovery grade of 5.98 dwt. gold per ton.The grade of ore (recovery grade) has shown a remarkable variation with depth. From the 120 ft. Ievel to the 300 ft. level, it averaged about 7.5 dwt. Au per ton. Below the 300 ft. level it declined, and from 300 ft. to 400 ft. averaged 4.9 dwt. per ton, falling further with increasing depth to about 4.5 dwt. per ton at the '600 ft. level.On the 820 ft. level the grade improved sharply to about 14 dwt: per ton, and this grade has persisted down to and on the 1060 ft. level.The orebody has been described by Finucane (1953) as a series of lenses of finely banded jaspilite conformably enclosed by greenstones. The jaspilite is tightly folded and faulted and intruded by dykes of felspar porpnyry.Mineralization is practically restricted to the jaspilite.
Return to parent product
  • The Mineral Composition of Ore from the Hill 50 Gold Mine, Western Australia
    PDF
    This product is exclusive to Digital library subscription
  • The Mineral Composition of Ore from the Hill 50 Gold Mine, Western Australia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1954
  • PDF Size: 1.338 Mb.
  • Unique ID: P_PROC1955_0784

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.