Skip to main content
Conference Proceedings

The AusIMM Proceedings 1960

Conference Proceedings

The AusIMM Proceedings 1960

PDF Add to cart

Control Methods in the Treatment of Beach Sand Minerals

Treatment processes are outlined for the recovery of rutile and zircon from the heavy mineral-bearing sands on the east coast of Australia. With the exhaustion of the higher grade deposits and the imposition of more rigid specifications for the finished products, strict metallurgical control has become necessary.A description is given of the methods used by The Titanium Alloy Manufacturing Co. Pty. Limited to control the operation of suction dredging, of wet concentration using fans and spirals, and of dry separation using high tension and electromagnetic processes. By applying these methods a plant designed for an output of 15,000 tons of rutile per year has been tuned to produce over 20,000 tons of rutile and a corresponding amount of zircon.Details are given of (a) the method of drilling to determine the extent and grade of the ore bodies, (b) a simple electrically-timed pneumatic automatic sampler, and (c) the methods developed for the physical estimation of quartz, rutile, zircon, ilmenite and "others" in the products of plant operation.The method used for calculating the metallurgical balance and the forms used for the reporting of production results are presented.Examples are given which show the value of this detailed production and metallurgical control of plant operation.INTRODUCTIONThe organization which is now known as "The Titanium Alloy Manufacturing Co. Pty. Limited" (T.A.M.Co.)-a subsidiary of National Lead Company-commenced operating at Yamba, N.S.W., in 1935. A mixed natural concentrate was at first simply dried and bagged and later was upgraded by the removal of silica and the lighter heavy minerals on shaking tables and, after air-drying, was bagged for export. At that time zircon was the most wanted constituent.
Return to parent product
  • Control Methods in the Treatment of Beach Sand Minerals
    PDF
    This product is exclusive to Digital library subscription
  • Control Methods in the Treatment of Beach Sand Minerals
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1959
  • PDF Size: 0.836 Mb.
  • Unique ID: P_PROC1960_0903

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.