Conference Proceedings
The AusIMM Proceedings 1960
Conference Proceedings
The AusIMM Proceedings 1960
Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 2 Utilization of Belt Conveyors
On the 18th November, 19'58, the first coal was delivered to the Morwell Power Station from the adjacent Open Cut using conveyors for the transport of the coal from the working face to the boiler bunkers. As the cut develops the coal seam will be worked for its full depth of about 360 feet from four benches, each feeding a conveyor line along th.e face and up out of the cut to the power station and briquette factory. By 1970 the estimated maximum daily demand reaches 60,000 tons and the total annual output 18 million tons. The complete conveyor installation will then total some 9 miles with a capital cost of over 3~ million.The choice of conveyors in place of the more usual rail system was made possible by the development of movable belt conveyors which use mechanical conveyor shifting, high belt speeds and flexible high strength belts and the paper deals with these and some other aspects of the scheme.INTRODUCTIONThe development of brown coal deposits is usually based on open cut workings equipped with a few large dredgers giving an almost continuous output of coal or overburden which has to be hauled a comparatively short distance. These are ideal conditions for conveyor operation, and it is surprising that, until recently, rail transport has been used almost exclusively in brown coal open cuts. In some cases inclined conveyors have been introduced to take the coal from the coal levels up out of the cut to bunkers at groundlevel, but trains have been left to operate between the ditch bunker feeding the conveyor system and the dredger.
Contributor(s):
J M Alexander
-
Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 2 Utilization of Belt ConveyorsPDFThis product is exclusive to Digital library subscription
-
Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 2 Utilization of Belt ConveyorsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1959
- PDF Size: 0.775 Mb.
- Unique ID: P_PROC1960_0906