A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Subsequent to the completion of this drive its extension for a further 6,200 ft was planned to provide a main haulage way along which ore could be transported from a newly acquired lease back to the main hoisting shaft, a total distance of 13,500 ft.This paper describes the working conditions, relationships, manning and costs, and gives details of the cycle and equipment used to achieve rates up to 170 ft per fortnight.OBJECTIVEDiamond drilling from the 1,000 ft level at the Delprat Shaft section had indicated that the zone of mineralization, about 150 ft wide, which had been explored on the 1,000 ft level for a length of 2,600 ft, continued downwards with a westerly dip. The drilling results showed that within this wide zone there were arrower lenses of mineralization of possibly payable grade (see composite plan, Fig. 1).Diamond drill holes of 2,000 ft and over, particularly through heavily sheared areas of sericite schist, had been found to be costly, slow, and inadequate in testing the potential and trends of these smaller concentrations of mineralization.It was therefore decided that an exploratory drive should be advanced from the northern limit of the 1,480 ft level into the western mineralization, and that from this drive diamond drill holes should be drilled at dose intervals to outline the ore.The 1,480 ft level was chosen for the following reasons.1. It had the greatest northerly reach of the accessible levels at No. 7 Shaft section below the 1,000 ft horizon and therefore would enable the test to be made most quickly.
Contributor(s):
A H Dutton
-
Driving the 1,480 Ft Level at the South Mine, Broken HillPDFThis product is exclusive to Digital library subscription
-
Driving the 1,480 Ft Level at the South Mine, Broken HillPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1964
- PDF Size: 1.558 Mb.
- Unique ID: P_PROC1965_1067