Conference Proceedings
The AusIMM Proceedings 1975
Conference Proceedings
The AusIMM Proceedings 1975
Avoiding Unnecessary Drilling
The extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian deposit shows that better estimation techniques at the end of the first drilling campaign are sufficient to achieve required control.Subsequent drilling would be essentially wasteful.
Contributor(s):
P I Brooker
-
SubscribeAvoiding Unnecessary DrillingPDFThis product is exclusive to Digital library subscription
-
Add to cartAvoiding Unnecessary DrillingPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1975
- PDF Size: 0.306 Mb.
- Unique ID: P_PROC1975_1376