Conference Proceedings
The AusIMM Proceedings 1977
Conference Proceedings
The AusIMM Proceedings 1977
Hydrometallurgical Treatment of Port Kembla Copper-Smelter Fume
A procedure was developed for recovering metal values from copper-smelter fume. The fume is first leached to neutrality with dilute sulphuric acid to obtain a solution of zinc sulphate containing a low level of impurities. The tailings from this leach are treated with hydrochloric acid in two stages, in which tin and zinc are quantitatively leached and recovered as a tin concentrate and a zinc sulphatelzinc chloride solution.About 80 per cent of the lead sulphate is converted into lead chloride, which can be recovered as a pure product.Data on the effect of temperature, acid concentration, aeration, and solid/liquid ratios on the hydrochloric acid leach are presented, and the fate of the most important metals during the recovery process is described. Alternative treatments of the tailings from the neutral sulphuric acid leach were briefly investigated.
Contributor(s):
D E Giles, A Boden
-
Hydrometallurgical Treatment of Port Kembla Copper-Smelter FumePDFThis product is exclusive to Digital library subscription
-
Hydrometallurgical Treatment of Port Kembla Copper-Smelter FumePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1977
- PDF Size: 0.947 Mb.
- Unique ID: P_PROC1977_1432