Raise Bored Shafts in Decline Mines

Western Mining Corporation (WMC), managers of the Windarra Nickel Project, installed a raise-bored haulage shaft and underground crushing system at the Mt Windarra Nickel Mine in 1982. The system is the second of its type installed by WMC, the first being at the Otter Juan Mine in Kambalda in 1976/77. Both haulage systems became necessary as a result of the increasing production limitations, and escalating costs of a deep decline mine.The Windarra haulage system required a single 3 m diameter vertical raise drill hole, 470 m deep and equipped for skip haulage. Two five tonne skips, in balance, hoist crushed ore and mullock to the surface, at a design rate of 200 tonne/hr, effectively reducing truck haulage leads by up to 50 per cent. The system is now fully operational and will enable the mine to achieve its maximum production rate.The raise-bored shaft system has been shown to be cost effective and would be used again in circumstances where raise drilling is applicable.
Return to parent product
  • Raise Bored Shafts in Decline Mines
    PDF
    This product is exclusive to Digital library subscription
  • Raise Bored Shafts in Decline Mines
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1984
  • PDF Size: 0.315 Mb.
  • Unique ID: P_PROC1984_1614

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.