Conference Proceedings
The AusIMM Proceedings 1988
Conference Proceedings
The AusIMM Proceedings 1988
Galena Flotation with Metabisulphite: Solutions to Problems from Xanthate Sulphoxy Ion Reactions
After an unsuccessful transfer from the laboratory to the pilot plant of galena flotation technology which used sodium metabisulphite and ethyl xanthate, laboratory flotation tests were conducted to identify any unusual variables which had a deleterious effect on the position of the lead rougher grade recovery curve for Hilton and Mount Isa silver-lead-zinc ores. Two variables (pulp temperature and contact time for ethyl xanthate and sodium metabisulphite) had important deleterious effects.The findings allowed a successful transfer of the laboratory process to a pilot plant scale process. The effect of temperature was important because the higher temperature (40C) in the pilot plant pulp increased significantly the rate of reaction between ethyl xanthate and sodium metabisulphite. In the laboratory process at 20 to 25C, the reaction rate was lower and did not interfere significantly with the process. The contact time for the two reagents was also important in the pilot plant scale process because of the higher reaction rate at 40C.To employ ethyl xanthate in the pilot plant process, special precautions were required. Further, a collector (Aerofloat 241) from the dithiophosphate family was used successfully in the pilot plant process.
Contributor(s):
G P Sheldon, N W Johnson
-
Galena Flotation with Metabisulphite: Solutions to Problems from Xanthate Sulphoxy Ion ReactionsPDFThis product is exclusive to Digital library subscription
-
Galena Flotation with Metabisulphite: Solutions to Problems from Xanthate Sulphoxy Ion ReactionsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1988
- PDF Size: 0.696 Mb.
- Unique ID: P_PROC1988_1720