Conference Proceedings
The AusIMM Proceedings 1993
Conference Proceedings
The AusIMM Proceedings 1993
Lead-zinc-silver Ore Concentration Practice at the Hilton Concentrator, Mount Isa Mines Limited, Mount Isa, Qld
Trial ore production began at the Hilton Mine in 1987 with ore being trucked into Mount Isa for treatment at the Lead/zinc Concentrator. The expansion of output from the Hilton mine required additional concentrator capacity which led to the design and construction of the Hilton Concentrator. Systematic laboratory and Pilot Plant testwork dating back to 1968 to develop a flowsheet and reagent regime suited to the varied and generally complex mineralogy of the Hilton ore was successfully concluded with a Pilot Plant trial using a sulphoxy based sphalerite depression system in early 1988.In May 1988, a decision was made to build a 750 000 t/y concentrator with some novel technological and capital-efficient features. The Hilton Concentrator commenced operations in December 1989 reaching target grinding rates and metallurgical performance by mid-1990. Current ore treatment rate is 800 000 t/y.Lead concentrates assaying 43 - 48 per cent Pb are combined with the Lead/Zinc Concentrator lead concentrates and smelted at Mount Isa. Zinc and Low Grade Middlings (LGM) concentrates are filtered in the zinc filter plant at Isa with those from the Lead/Zinc Concentrator and then railed to Townsville for export or treatment in Australia.
Contributor(s):
P Rohner
-
Lead-zinc-silver Ore Concentration Practice at the Hilton Concentrator, Mount Isa Mines Limited, Mount Isa, QldPDFThis product is exclusive to Digital library subscription
-
Lead-zinc-silver Ore Concentration Practice at the Hilton Concentrator, Mount Isa Mines Limited, Mount Isa, QldPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1993
- PDF Size: 0.219 Mb.
- Unique ID: P_PROC1993_1803