Conference Proceedings
The AusIMM Proceedings 1993
Conference Proceedings
The AusIMM Proceedings 1993
Mount Isa Mines Limited Copper Leach SX-EW Pilot Plant
During the 1960s chalcocite ore was mined from the Black Rock open cut. A large amount of this uneconomic material was not treated by the No 3 Concentrator at the time and as a consequence a surface stockpile was created which contained 750 000 tonnes of material at an average of 1.5 per cent copper.Laboratory trials indicated that due to oxidation, an average of 25 per cent of the copper was water soluble and the remaining copper was leachable using a sulphate/ferriclbacterial leach. On the basis of these trials it was decided to investigate the feasibility of producing copper via a leach SX-EW process. The investigation proved the process was feasible, so began the design, construction and commissioning of a 10 tpd (cathode copper) Copper Leach SX-EW Pilot Plant. CMPS Pty Limited in a joint venture with John Holland Engineering Pty Limited were awarded the turnkey contract for the design, construction and commissioning of the Pilot Plant.
Contributor(s):
D Readett
-
Mount Isa Mines Limited Copper Leach SX-EW Pilot PlantPDFThis product is exclusive to Digital library subscription
-
Mount Isa Mines Limited Copper Leach SX-EW Pilot PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1993
- PDF Size: 0.075 Mb.
- Unique ID: P_PROC1993_1806