Conference Proceedings
The AusIMM Proceedings 1996
Conference Proceedings
The AusIMM Proceedings 1996
A Survey of Current Approaches to The Optimum Ultimate Open-Pit Planning Problem
Most research into planning of open pit mines has been based on evaluation of volume-element block models in terms of their net present value. The major issues revolve around two interdependent problems the optimum ultimate pit and time-based scheduling. Despite feedback between the two problems, they are usually treated as separate tasks.The ultimate open pit is defined by the removal of whole blocks so that their net present value is maximised. This gives planners an estimate of the total worth of the venture in present terms, and is crucial to obtaining funding. All cost and profit values are assumed to be static throughout the mine life, and the only physical constraint usually taken into account is that of safe, average, wall slopes, which must be approximated by the removal of whole blocks. Modelling of any further constraints (for example, access roads and true wall slopes) is usually achieved by adding them to the optimal pit by hand. Typically this degrades the model by between five and 20 per cent of its value - which then brings into question whether it is still the true optimum.This paper reviews the dominant methods in use for this first task the ultimate open-pit planning problem. Some new optimisations are given, and the algorithms are examined in terms of their efficiency and accuracy. Finally, suggestions are made for improvement of model accuracy and eventual expansion into solutions of the more complete dual problem - that of simultaneously finding the optimum ultimate pits and dynamic schedules for the venture.
Contributor(s):
T Gill, M Robey, T Caelli
-
A Survey of Current Approaches to The Optimum Ultimate Open-Pit Planning ProblemPDFThis product is exclusive to Digital library subscription
-
A Survey of Current Approaches to The Optimum Ultimate Open-Pit Planning ProblemPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1996
- PDF Size: 0.815 Mb.
- Unique ID: P_PROC1996_1851