Conference Proceedings
Third Large Open Pit Mining Conference, Mackay, August 1992
Conference Proceedings
Third Large Open Pit Mining Conference, Mackay, August 1992
Development of Drilling and Blasting Practices at The Vickery Coal Mine
The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation adopted from the feasibility studies requires that throw blasting of the overburden be used to assist dragline productivity.
This paper reviews the development of the drilling and blasting practices with particular emphasis on the throw blasting of the overburden and optimisation of costs. This review includes analysis of the pre-production drilling and blasting feasibility studies by comparison with actual results.
This paper reviews the development of the drilling and blasting practices with particular emphasis on the throw blasting of the overburden and optimisation of costs. This review includes analysis of the pre-production drilling and blasting feasibility studies by comparison with actual results.
Contributor(s):
G Paine, R Conley, I Payne
-
Development of Drilling and Blasting Practices at The Vickery Coal MinePDFThis product is exclusive to Digital library subscription
-
Development of Drilling and Blasting Practices at The Vickery Coal MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 0.416 Mb.
- Unique ID: P199208014