Skip to main content
Conference Proceedings

Third Large Open Pit Mining Conference, Mackay, August 1992

Conference Proceedings

Third Large Open Pit Mining Conference, Mackay, August 1992

PDF Add to cart

Development of Drilling and Blasting Practices at The Vickery Coal Mine

The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation adopted from the feasibility studies requires that throw blasting of the overburden be used to assist dragline productivity.
This paper reviews the development of the drilling and blasting practices with particular emphasis on the throw blasting of the overburden and optimisation of costs. This review includes analysis of the pre-production drilling and blasting feasibility studies by comparison with actual results.
Return to parent product
  • Development of Drilling and Blasting Practices at The Vickery Coal Mine
    PDF
    This product is exclusive to Digital library subscription
  • Development of Drilling and Blasting Practices at The Vickery Coal Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1992
  • PDF Size: 0.416 Mb.
  • Unique ID: P199208014

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.