Conference Proceedings
Third Large Open Pit Mining Conference, Mackay, August 1992
Conference Proceedings
Third Large Open Pit Mining Conference, Mackay, August 1992
Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?
Tailings dams constructed by the upstream method have traditionally been built using the sand fraction of the tailings, which has automatically provided a relatively permeable embankment material, and helped provide the necessary drainage conditions which are a pre-requisite for safe and stable dam construction using this method. This paper discusses some recent trends which have resulted in proposals to use impermeable material in place of the sand fraction as the embankment material, both for the starter dam, and subsequent lifts. The consequences of these types of decisions on the overall stability of the dam are illustrated, and the need for continued monitoring of pore pressures in the tailings as the dam is raised is emphasised.
Contributor(s):
K Seddon, P A Williams
-
Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?PDFThis product is exclusive to Digital library subscription
-
Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 0.658 Mb.
- Unique ID: P199208064