Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?

Tailings dams constructed by the upstream method have traditionally been built using the sand fraction of the tailings, which has automatically provided a relatively permeable embankment material, and helped provide the necessary drainage conditions which are a pre-requisite for safe and stable dam construction using this method. This paper discusses some recent trends which have resulted in proposals to use impermeable material in place of the sand fraction as the embankment material, both for the starter dam, and subsequent lifts. The consequences of these types of decisions on the overall stability of the dam are illustrated, and the need for continued monitoring of pore pressures in the tailings as the dam is raised is emphasised.
Return to parent product
  • Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?
    PDF
    This product is exclusive to Digital library subscription
  • Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1992
  • PDF Size: 0.658 Mb.
  • Unique ID: P199208064

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.