Conference Proceedings
Third Regional APCOM Conference Volume
Conference Proceedings
Third Regional APCOM Conference Volume
An Expert System of Scheduling a Successive Plan for Mining and Development in Coal Mines
Drawing up the successive plan for mining and development is a very important and regular plan work. The expert system of the successive plan for mining and development drawn up by computer is developed on the basis of network, computer simula
Contributor(s):
L Xuezhong, X jingmin, C Hongzhang, H Zongxin, X Wenhua
-
An Expert System of Scheduling a Successive Plan for Mining and Development in Coal MinesPDFThis product is exclusive to Digital library subscription
-
An Expert System of Scheduling a Successive Plan for Mining and Development in Coal MinesPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.379 Mb.
- Unique ID: P199805004