E26 Lift 1 North block cave development and construction
                            
The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared to the previous E48 Block Cave construction 12 years prior, which was of a similar size and design with ten extraction drives, crusher and conveyors, the E26 Lift 1 North project has been delivered at 29 per cent less capital cost. Key metrics achieved by the project include 12.7 km of development, 240 km of production drilling for drawbells and undercut blasting, 107 drawbells fired ready for production as well as only three Lost Time Injuries compared to 16 during E48 construction. The Lift 1 North Project Team has established a significant point of difference with the delivery being completed by the ‘Owners Team Model’ not Lump Sum or Turn-key. E26 Lift 1 North is now supplying the Northparkes processing plant for the next eight years. This paper discusses major milestones achieved throughout the process, modifications to processes from previous block cave construction at Northparkes as well as novel approaches to work to achieve the successful delivery of the project.
                        
                    
                        
                                    
                                        Contributor(s):
                                    
                                    R Cunningham, S Melloni and M Greenaway
                                
                            - 
                                                            SubscribeE26 Lift 1 North block cave development and constructionPDFThis product is exclusive to Digital library subscription
 - 
                                                            Add to cartE26 Lift 1 North block cave development and constructionPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
 
                                        
                                        PD Hours
                                    
                                    
                                        
                                            Approved activity
                                        
                                    
                                - Published: 2023
 - Pages: 14
 - PDF Size: 1.349 Mb.
 - Unique ID: P-03015-W8K8B5