Conference Proceedings
Underground Operators' Conference, West Coast Tasmania
Conference Proceedings
Underground Operators' Conference, West Coast Tasmania
Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill
Loader cut and fill stoping was first used at New Broken Hill Consolidated Limited mine in 1966. The equipment used included single boom pneumatic jumbos for drilling up- holes, diesel loaders for ore removal and diesel utility vehicles for rockbolting and servicing. Since 1966, there have been many modifi- cations and changes both in the equipment and stoping method. Twin boom pneumatic or hy- draulic drilling jumbos have replaced single boom pneumatic jumbos, electric loaders have replaced diesel loaders, diesel forklifts have replaced utility vehicles and "'flatbacking" has superseded uphole stoping. Concurrent with this has been the introduction of cable dowels in stope backs which has enabled loader cut and fill stoping to be used more extensiv- ely than in the past. There are now six loader cut and fill stopes at both mines and this paper traces the evolution of this method outlining the reasons for changes in technique and equipment.
Contributor(s):
W C Taylor, D J Bailey
-
Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken HillPDFThis product is exclusive to Digital library subscription
-
Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken HillPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1982
- PDF Size: 0.17 Mb.
- Unique ID: P198203009