Skip to main content
Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

PDF Add to cart

Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill

Loader cut and fill stoping was first used at New Broken Hill Consolidated Limited mine in 1966. The equipment used included single boom pneumatic jumbos for drilling up- holes, diesel loaders for ore removal and diesel utility vehicles for rockbolting and servicing. Since 1966, there have been many modifi- cations and changes both in the equipment and stoping method. Twin boom pneumatic or hy- draulic drilling jumbos have replaced single boom pneumatic jumbos, electric loaders have replaced diesel loaders, diesel forklifts have replaced utility vehicles and "'flatbacking" has superseded uphole stoping. Concurrent with this has been the introduction of cable dowels in stope backs which has enabled loader cut and fill stoping to be used more extensiv- ely than in the past. There are now six loader cut and fill stopes at both mines and this paper traces the evolution of this method outlining the reasons for changes in technique and equipment.
Return to parent product
  • Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill
    PDF
    This product is exclusive to Digital library subscription
  • Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1982
  • PDF Size: 0.17 Mb.
  • Unique ID: P198203009

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.