Skip to main content
Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

PDF Add to cart

Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The choice of internal shaft access was made over alternative methods such as a decline from existing levels and borehole hoisting. The resulting access development requirements and shaft configuration for production have been determined. Several techniques are being studied for shaft development. These include the application of blind shaft drilling and large hole reaming methods as well as conventional sinking techniques. As the 3000/3500 Orebodies extend from 1000 metres to more than 1800 metres below the surface, high stress conditions and ground temperatures ranging from 45CC to 62CC are anticipated. The effect of these on the methods being investigated to create a favourable working environment will influence the final choice. Exploration diamond drilling is in progress to confirm the geology of the orebodies so that planning for their extraction including refrigerated ventilation concepts can proceed.
Return to parent product
  • Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited
    PDF
    This product is exclusive to Digital library subscription
  • Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1982
  • PDF Size: 0.516 Mb.
  • Unique ID: P198203018

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.