Skip to main content
Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

PDF Add to cart

Post-Hole Shafts in Decline Mines

Western Mining Corporation, managing partner of the Windarra Nickel Project are in- stalling a raise-bored haulage shaft and under- ground crushing system at the Mt. Windarra Nickel Mine. The system will be the second of its type installed by W.M.C., the first being in- stalled at the Otter-Juan mine in Kambalda in 1976/77. Both haulage systems became necessary as a result of the increasing production limi- tations, and escalating costs of a deep decline mine. The Windarra haulage system required a single 3m diameter vertical raise drill hole to a depth of 470 metres. Two five tonne skips in balance will hoist crushed ore and mullock to the surface, at a design rate of 200 tonnes per hour, effectively reducing truck haulage leads by up to 50%. It is expected the project will be in full operation by mid 1982 and will enable the mine to achieve an annual production rate of 600,000 t.p.a. by 1983.
Return to parent product
  • Post-Hole Shafts in Decline Mines
    PDF
    This product is exclusive to Digital library subscription
  • Post-Hole Shafts in Decline Mines
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1982
  • PDF Size: 0.447 Mb.
  • Unique ID: P198203020

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.