Conference Proceedings
Value Tracking Symposium 2002
Conference Proceedings
Value Tracking Symposium 2002
Grade Control at a Multi-Source Operation - Mount Isa Lead Mine, Mount Isa
Mount Isa Mines has four mining operations in Mt Isa with the X41 and Enterprise Mines producing copper and the Lead Mine and George Fisher producing lead zinc and silver. Each stream contributes ore to their respective concentrator at a feed rate and therefore metal ratio set out by the monthly schedule. Mine Planning and scheduling lead to a sales and operating plan (S&OP) and revenue projections which ultimately derives actual revenue /tonne and therefore cost/tonne. At Mount Isa, both the copper and lead/zinc streams produce ore from relatively new operations to be blended with material from more mature operations. It is critical to accurately predict the metal contribution from each operation in order to gauge the relative performance of each mine. Development mining ore contributions are estimated and reconciled, as are stope and bench sources. Performance is continually measured and assessed during extraction and grade adjustments are made to account for underbreak, overbreak and design modifications. It is critical to not understate or overstate the contribution from one operation relative to the other as this can produce a false picture of operational performance. Identifying process improvements are key to improving the business overall. Ore from the lead stream passes 17 measurement stations and two midstream reconciliation points before delivery to the heavy media plant (HMP), where the metallurgical circuit begins. From this point two concentrates are produced. A zinc concentrate for treatment off site and a lead concentrate for further on site processing. The lead smelter takes 100 per cent of Isa concentrates as well as a contribution from BHP-Billiton's Cannington Mine.
Contributor(s):
C J Huddy, N Davies, P L Hissey, M J Coward
-
Grade Control at a Multi-Source Operation - Mount Isa Lead Mine, Mount IsaPDFThis product is exclusive to Digital library subscription
-
Grade Control at a Multi-Source Operation - Mount Isa Lead Mine, Mount IsaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2002
- PDF Size: 1.585 Mb.
- Unique ID: P200208005