Design of Segmental Lining for Waterview Project, Auckland, NewZealand
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Auckland for the New Zealand Transport Agency.The design and detailing of this segmental lining presented some noteworthy challenges, including an alignment that has sections of low cover in soft ground. Key points of interest are that this precast segmental lining is the largest to ever include steel fibres as the primary method of reinforcement and the lining includes cams on circumferential joints to control ring deformation.The paper describes some of the key design decisions that were made in a collaborative manner with the construction team, tunnel boring machine manufacturer, segment manufacturer and the designers.CITATION:Mahajan, R, Kuras, A and Pradhan, S, 2014. Design of segmental lining for Waterview Project, Auckland, NewZealand, in Proceedings 15th Australasian Tunnelling Conference 2014 , pp 289-294 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
R Mahajan, A Kuras, S Pradhan
-
Design of Segmental Lining for Waterview Project, Auckland, NewZealandPDFThis product is exclusive to Digital library subscription
-
Design of Segmental Lining for Waterview Project, Auckland, NewZealandPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2014
- PDF Size: 1.588 Mb.
- Unique ID: P201411034