Achieving 435-2540 Tonnes Per Shift from Continuous Miner Sections, A Report on the USA's Most Productive Coal Mines

The U.S. Department of Interior's Bureau of Mines has the opportunity to visit many U.S._x000D_
mines, including some that claim 2 to 5 times the national average of 334 raw tonnes/unit shift (tps) from a continuous miner section. In a project to assess the reasons for this high production, the Bureau conducted two studies. The first study focused on the 25 highest producing continuous miner sections. What stood out during the visits-was the quality of the labor-management relations. In each of the mines there was a positive labor/management relationship based on mutual trust and a sense that the employees were the company's most valuable resource. Discussions with labor revealed a universally positive attitude toward the company. Interviews with the mine superintendents invariably ranked the quality and attitude of workers as more important than anything else. Also during the mine visits of the 25- mine study, no engineering factors obviously stood out. Time at the face was greater than average, most were in coal over 1.52 m and the roof was generally good. Also, none of the 25 mines had to contend with high methane levels._x000D_
Because this study found that a high percentage of mines were in seams less than 1.52 m thick, the second study examined thin seam mines only.
Return to parent product
  • Achieving 435-2540 Tonnes Per Shift from Continuous Miner Sections, A Report on the USA's Most Productive Coal Mines
    PDF
    This product is exclusive to Digital library subscription
  • Achieving 435-2540 Tonnes Per Shift from Continuous Miner Sections, A Report on the USA's Most Productive Coal Mines
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.186 Mb.
  • Unique ID: P198801004

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.