Skip to main content
Conference Proceedings

21st Century Higher Production Coal Mining Systems Symposium, Wollongong

Conference Proceedings

21st Century Higher Production Coal Mining Systems Symposium, Wollongong

PDF Add to cart

Implications of High Productivity Long Wall Systems

The areas of impact when employing high productivity long wall systems are reviewed and the financial implications of the most significant areas highlighted. A distinction has been made between availability and utilization. The need for more efficient delay recording, together with increasing control and utilization of the systems has been identified and the measurability of the latter discussed._x000D_
The increased use of electronic delay reporting direct from the operating unit as the basis for operational control and a pre-emptive maintenance philosophy is seen as an important area of achieving higher performances from existing long wall production systems and Configurations.
Return to parent product
  • Implications of High Productivity Long Wall Systems
    PDF
    This product is exclusive to Digital library subscription
  • Implications of High Productivity Long Wall Systems
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.643 Mb.
  • Unique ID: P198801018

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.