Skip to main content
Conference Proceedings

Annual Conference, Broken Hill

Conference Proceedings

Annual Conference, Broken Hill

PDF Add to cart

A Modified Cable Bolt System For The Support Of Underground Openings

Past experience with fully bonded cable dowels placed as a means of reinforcement in highly stressed crop pillars at the New Broken Hill Consolidated Limited (NBHC) mine indicated such support was not fully effective. Typically overbreak of the crown occurred leaving long lengths of cables hanging from the back stripped of grout and rock with the potential load carrying capacity of the cables not having been fully utilised. This mode of behaviour had been observed in the cable dowelled crowns of three longhole open stopes (EROS) mined to the No. 12 level at NBHC. A system of support with improved mechanism of load transfer from rock to cable and capable of full utilisation of cable strength was proposed for the crown pillars of future Stopes.
Return to parent product
  • A Modified Cable Bolt System For The Support Of Underground Openings
    PDF
    This product is exclusive to Digital library subscription
  • A Modified Cable Bolt System For The Support Of Underground Openings
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1982
  • PDF Size: 1.151 Mb.
  • Unique ID: P198302002

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.