Skip to main content
Conference Proceedings

Annual Conference, lllawara

Conference Proceedings

Annual Conference, lllawara

PDF Add to cart

Aspects of In-Seam Development for Subsequent Full Extraction

Severe development difficulties were experienced soon after in-seam mining commenced at Appin Colliery in'1962. Thirteen years later no significant pro- gress had been made in overcoming some aspects of this development problem. Some success had been achieved in destressing roadways both in development and pillar extraction. Longwall retreat mining had shown promise of being highly productive but at an extremely high cost in terms of development requirements both in number of roadways and intensity of support in those roadways. No real advance was made in the problem of driving the first heading of a group of headings under conditions of apparently high stress in directions other than the preferred mining directions, although failure of the roof in this heading did seem to give easier work in the subsequent headings driven particularly if they were driven on narrow centres.
Return to parent product
  • Aspects of In-Seam Development for Subsequent Full Extraction
    PDF
    This product is exclusive to Digital library subscription
  • Aspects of In-Seam Development for Subsequent Full Extraction
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1975
  • PDF Size: 0.383 Mb.
  • Unique ID: P197605003

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.