The Commissioning of No. 5 Blast Furnace at Port Kembla

Present capacity for molten iron production at Port Kembla is an average of 13 000 t/day from five blast furnaces. The most recently installed blast furnace, No.5, was commissioned in March 1972 with a design capacity of 4 500 t/day. For the first reline currently scheduled for 1977, plans are being finalized.for significant modifications and uprating of capacity. Achievement of the initial design capacity from No.5 blast furnace on a sustained basis was not realised until the third year of operation._x000D_
Although the furnace is only 42% larger than No.4 blast furnace on an inner volume basis, the more stringent raw materials, operation and maintenance requirements of the larger furnace and more complex equipment have been found to be much more critical than anticipated in the planning stages. These problems have also been experienced by many other companies who have recently installed large new blast furnaces. Some of the principal problem areas are described together with measures taken to over- come the difficulties. The problem areas include the failure of'the shower cooled bosh, failure of the upper shaft brickwork, sludge
Return to parent product
  • The Commissioning of No. 5 Blast Furnace at Port Kembla
    PDF
    This product is exclusive to Digital library subscription
  • The Commissioning of No. 5 Blast Furnace at Port Kembla
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1975
  • PDF Size: 0.471 Mb.
  • Unique ID: P197605022

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.