The Recovery of PW Zinc from Lead Blast Furnace Slags by Electrothermic Process at Chigirishma Smelter of Toho Zinc Co. Ltd.
The Chigirishima Smelter of Toho,Zinc Co., Ltd. is the largest independent custom lead smelter in Japan and produces about 60,000 tonnes/yr of electrolytic lead. The quantity of slag produced by blast furnace is approximately 65,000 tonnes/yr, 30,000 tonnes/yr of which is sent back to the sintering plant for mixing with lead concentrates. The remaining slag used to be piled up at the yard until the operation of the fuming plant started in July 1977. We examined the slag fuming process with the purpose of achieving: 1) Improvement of the operating results by recovering zinc and lead from blast furnace slag. The lead content in slag at Chigirishima is slightly high, because the height of blast furnace shaft is low and consequently the quantity of sinter smelted per area at tuyere level is rather large. 2) Production of a salable slag as raw material for cement by lowering zinc and lead content in slag.
Contributor(s):
U Itoh, T Yamakita, Y Yoneoka
-
The Recovery of PW Zinc from Lead Blast Furnace Slags by Electrothermic Process at Chigirishma Smelter of Toho Zinc Co. Ltd.PDFThis product is exclusive to Digital library subscription
-
The Recovery of PW Zinc from Lead Blast Furnace Slags by Electrothermic Process at Chigirishma Smelter of Toho Zinc Co. Ltd.PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1980
- PDF Size: 0.12 Mb.
- Unique ID: P198002040