Conference Proceedings
COAL98 - First Australasian Coal Operators' Conference, Wollongong, NSW, February 1998
Conference Proceedings
COAL98 - First Australasian Coal Operators' Conference, Wollongong, NSW, February 1998
Ulan Highwall Project
HIGHWALL MINING - DECISION TO MINE
Ulan had completed operations in the first Open Cut area due to high stripping ratios and the presence of geological
features which destroyed a significant portion of the coal in the upper part of the seam. The pit had been abandoned in
1994 and operations had moved to a new location to the north west.
Ulan had completed operations in the first Open Cut area due to high stripping ratios and the presence of geological
features which destroyed a significant portion of the coal in the upper part of the seam. The pit had been abandoned in
1994 and operations had moved to a new location to the north west.
Contributor(s):
P Ferguson
-
Ulan Highwall ProjectPDFThis product is exclusive to Digital library subscription
-
Ulan Highwall ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.879 Mb.
- Unique ID: P199806066