Skip to main content
Conference Proceedings

Computers in Mining, Southern Queensland

Conference Proceedings

Computers in Mining, Southern Queensland

PDF Add to cart

Use of Computerised Management Systems for the Blair Athol Coal mine Project

As Project Managers for the Blair Athol Coal Mine Project, CMPS selected a number of computer systems to assist in project control. The areas where computers were used were: 1) Planning & Scheduling 2) Procurement Reporting 3) Document Control 4) Accounting 5) Cost Control 6) Control of project management and engineering manhours The computer packages selected were generally effective in their own areas._x000D_
During 1982, CMPS acquired an in-house project control package called GC/Cue._x000D_
Project control systems for the project are progressively being set up on this system._x000D_
The advantages of this type of system are: 1) Improved accessibility of information, due to on-line operation and the use of VDU's. 2) Improved turn around time for computer runs and production of reports. 3) Improved presentation and format of reports. 4) Lower costs.
Return to parent product
  • Use of Computerised Management Systems for the Blair Athol Coal mine Project
    PDF
    This product is exclusive to Digital library subscription
  • Use of Computerised Management Systems for the Blair Athol Coal mine Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1982
  • PDF Size: 0.093 Mb.
  • Unique ID: P198301032

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.