Skip to main content
Conference Proceedings

Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference

Conference Proceedings

Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference

PDF Add to cart

The Use of Roadheading Machines in the Construction of the Liverpool Link Line

The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable rock formations. A description is given of the strata traversed by the tunnels together with descriptions of equipment and crews, excavation sequences, operating difficulties and the results achiev- ed. In addition tunnel construction is des- cribed for a difficult section where there was only O.Sm clearance between invert and a four lane vehicular tunnel below, and O.5m clearance between tunnel crown and a century old sewer above.
Return to parent product
  • The Use of Roadheading Machines in the Construction of the Liverpool Link Line
    PDF
    This product is exclusive to Digital library subscription
  • The Use of Roadheading Machines in the Construction of the Liverpool Link Line
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1975
  • PDF Size: 0.467 Mb.
  • Unique ID: P197602014

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.