Skip to main content
Conference Proceedings

Extractive Metallurgy Symposium, Melbourne

Conference Proceedings

Extractive Metallurgy Symposium, Melbourne

PDF Add to cart

Benefits of Feed Changes on Nickel Refining Operation at Kwinana Nickel Refinery

Western Mining Corporation (W.M.C.) operates a nickel refinery at Kwinana, 30 km south of Perth. The refinery commenced pro- duction in May 1970, with a rated capacity of 15 000 tpa of nickel metal. A hydrometallurgical route was chosen as the most expedient way to produce nickel metal at a time when world demand for nickel was outstripping the supply. Later events dictated that an increase in production from the refinery be achieved. To this end, matte produced from Kalgoorlie Nickel Smelter, which was commissioned in 1972, was used in varying proportions as a complement to the concentrate initially utilised as input to the refinery. The effect of matte addition was to increase the capacity to 30 000 tonnes of nickel per annum. This was accompanied by other benefits which were 1. reduction in energy consumption per unit of nickel produced, 2. improved metal extraction, 3. improved precious metal recovery, 4. reduced production of ammonium sulphate by-product. Refinery operating results for the years 1970 to 1983 show how matte feed has improved refinery performance in these areas.
Return to parent product
  • Benefits of Feed Changes on Nickel Refining Operation at Kwinana Nickel Refinery
    PDF
    This product is exclusive to Digital library subscription
  • Benefits of Feed Changes on Nickel Refining Operation at Kwinana Nickel Refinery
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1983
  • PDF Size: 0.486 Mb.
  • Unique ID: P198401009

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.