The Direct Filling of 1100 Orebody Stopes from Surface at Isa Mine
In early-1989, subsidence due to voids at the top of previously filled stopes and stopes awaiting filling,began to threaten the 15 level fill conveyor horizon. This together with the need to maintain production targets meant that a method was required to significantly increase fill placement.
Alternative methods of placing dry fill underground were investigated. One option was to drill 200 mm boreholes from surface directly into stopes 600 - 800 metres underground. A drilling program was successfully undertaken, and resulted in the placement of more than 800 000 tonnes of dry aggregate fill via four boreholes. This paper details the drilling program undertaken and discusses the difficulties encountered, the fill placement system and the project costs.
Alternative methods of placing dry fill underground were investigated. One option was to drill 200 mm boreholes from surface directly into stopes 600 - 800 metres underground. A drilling program was successfully undertaken, and resulted in the placement of more than 800 000 tonnes of dry aggregate fill via four boreholes. This paper details the drilling program undertaken and discusses the difficulties encountered, the fill placement system and the project costs.
Contributor(s):
S Jones
-
The Direct Filling of 1100 Orebody Stopes from Surface at Isa MinePDFThis product is exclusive to Digital library subscription
-
The Direct Filling of 1100 Orebody Stopes from Surface at Isa MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 0.578 Mb.
- Unique ID: P199206023