  • An application of Monitoring and Numerical Modelling in Open Stope Mining Go to Paper
  • Aspects of Design and In-Situ Testing for the Murl Rock Tunnels Go to Paper
  • Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo Go to Paper
  • Comparison of Rock Tunnel Excavation Methods Used on the Melbourne Underground Rail Loop Go to Paper
  • Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project Go to Paper
  • Design of Underground Works for the Eastern Suburbs Railway, Sydney Go to Paper
  • Diversion Tunnels for the Magat River Multi-purpose Project-Geotechnical Aspects Go to Paper
  • Extensions to Melbourne's Telecom Cable Tunnel Network Go to Paper
  • General Aspects of Legislative Control and Safety in Tunneling and Allied Operations Go to Paper
  • Instability of Roof Conditiond in a Hunter Valley Coal Mine due to Large Scale Mass Sliding Go to Paper
  • Interpretation of Field Stresses and Deformation Moduli from Extensometer Measurements in Rock Tunnels Go to Paper
  • Investigation and Construction of Tunnels in Tamalia Limestone, Perth, Western Australia Go to Paper
  • Larger Diameter Blastholes-A Proposed Means of Increasing Advance Rates Go to Paper
  • Long Tunnel extended Gold Mine, Walhalla-A Recovery and Rehabilitation Project Go to Paper
  • Museum Station Conceptual Planning and Preliminary Works Go to Paper
  • Museum Station -Construction Go to Paper
  • Museum Station -Structural and Architectural Design Go to Paper
  • New Developments to Lead Mechanical Underground Excavation Toward the Year 2000 Go to Paper
  • Planning, Design and Construction of a Small Multi-use Tunnel in an Urban Environment Go to Paper
  • Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop Project Go to Paper
  • Redevelopment of the Carnilya Hill Mine Go to Paper
  • Refurbishment of Brisbane's Rail Tunnels for Electrification Go to Paper
  • Review of Ground Support Systems at King Island Scheelite Go to Paper
  • Shaft Sinking for the Thomson Tunnel Stage 3 Application of a Full Face Rotary Head Shaft Borer Go to Paper
  • Shallow Compressed Air Tunnelling on the Murl Project Go to Paper
  • Station Electrical and Mechanical Design Go to Paper
  • The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project Go to Paper
  • The Engineering Tasks Go to Paper
  • The Melbourne Underground Rail Loop Overall Tasks and Organisation Go to Paper
  • The4 Change in Performance of Disc Cutters when Stalled Go to Paper
  • Tunnelling Contracts-issues and Suggestions Go to Paper
  • Underground Excavation through Filldesign, Mining Practice and Safety Aspects Go to Paper
PD Hours