Skip to main content
Conference Proceedings

Fourth Australian Tunnelling Conference

Conference Proceedings

Fourth Australian Tunnelling Conference

PDF Add to cart

The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include Electrical and Mechanical Services and 4) Supply and Installation of lifts and escalators._x000D_
Specific areas of interest include the fabrication, installation and removal of temporary support steelwork, the monitoring of ground loading, and the interface between the structure and. the temporary support. The information collated during construction confirmed the design assumptions and criteria._x000D_
No major changes'were required in the design of the construction methods. The open cut excavation and construction of this major structure in an inner city area was significant by any standard and was successfully completed with minimum disruption to the public and without damage to adjoining or surrounding property.
Return to parent product
  • The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project
    PDF
    This product is exclusive to Digital library subscription
  • The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1981
  • PDF Size: 0.856 Mb.
  • Unique ID: P198102027

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.