Skip to main content
Conference Proceedings

Ground Movement and Control Related to Coal Mining, Wollongong

Conference Proceedings

Ground Movement and Control Related to Coal Mining, Wollongong

PDF Add to cart

Development of Strata Control at Tahmoor Mine

Tahmoor Mine is located in the southern Sydney Basin 80km south-west of Sydney and produces 1.2 MT of Bulli Coal annually. Bord and pillar methods used to date will be supplemented by a longwall system. Difficult roof conditions have been experienced since mining began in 1979. A dominantly horizontal stressfield promotes shear failure in the thinly interbedded roof sequence of shales, laminites, siltstones and fine sandstones. General roof conditions and failure characteristics are related to the angle between the roadway direction and the principal horizontal stress direction. The apparent stressfield changes direction, magnitude and the ratio of principal horizontal components across the mine workings in response to both in situ and mining induced causes. Initial roof support of 5 x 2.1 m bolts per W-strap at in intervals, with mesh, was upgraded to include RSJ's in order to support areas of failed roof. This support system was inefficient and costly. A third system of support emphasizes roof reinforcement with full resin encapsulation of 2.1 m bolts in W-straps. The number of bolts per strap (6-8), extra butterfly straps and bolts, and W-strap spacing is determined for each area by expected roof and stress conditions. Intersections are pre-bolted and ribs are supported in some areas. Pillar dimensions, order of drivage and roadway width have each been altered to improve roof control. The intensity of roof deformation at the face varies from panel to panel and causes development rates to decrease to 30% of the maximum. 1. Manager, Tahmoor Mine, Tahmoor, N.S.W._x000D_
2. Senior Geologist, BP Coal, Picton, N.S.W. Roof conditions in each area of the mine are characterised and then projected to future development areas based on the relationship between stressfield orientation, relative roadway direction and face conditions._x000D_
Planning information available includes expected development rates, roof support requirements and areas of changing conditions. Future improvements of strata control involve defining support design parameters for the range of mine conditions already seen at Tahmoor.
Return to parent product
  • Development of Strata Control at Tahmoor Mine
    PDF
    This product is exclusive to Digital library subscription
  • Development of Strata Control at Tahmoor Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1985
  • PDF Size: 0.554 Mb.
  • Unique ID: P198603008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.