Skip to main content

We are currently investigating a technical issue affecting the cart and checkout process, which is preventing users from completing their transactions. We apologise for the inconvenience caused.

Conference Proceedings

International Mine Health and Safety Conference Proceedings 2024

Conference Proceedings

International Mine Health and Safety Conference Proceedings 2024

PDF Add to cart

Comparison of risk register quality and consistency using causal network topology analysis

For multi-site mining companies, checking the quality and consistency of the data recorded in risk registers is important for confirming how well mine safety management systems have been implemented. However, this task is complicated by the differences in scope of the site, their particular nature, the complexity of the operations and many other factors that can introduce nuances to the characteristics of the risk registers.
We present here an application of a technique called Causal Network Topology Analysis for comparing the quality and consistency of risk registers. By quality we refer to, for example:
- missing causal relationships between risks
- location of missing controls
- focus of risk treatment strategies: prevention versus mitigation controls.
By consistency we refer to how causally interdependent are the risk events. There are often causal interactions between the lines of a risk register that mean that the likelihood and consequence scores that are applied to each risk event are not independent. We measure this degree of interactions by:
- proportion of independent scenarios per register
- efficiency of risk treatment strategy comparison.
This approach can indicate quality and consistency differences between registers irrespective of the actual details of the site or operation. This occurs by comparing aspects of the structure of a causal network extracted from how the risk events, causes, controls and consequences causally interact. In this work we compare pairs of registers to demonstrate the approach.
Return to parent product
  • Comparison of risk register quality and consistency using causal network topology analysis
    PDF
    This product is exclusive to Digital library subscription
  • Comparison of risk register quality and consistency using causal network topology analysis
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2024
  • Pages: 14
  • PDF Size: 3.834 Mb.
  • Unique ID: P-03477-L9L3M8
  • ISBN no: 978-1-922395-26-9

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.