Skip to main content
Conference Proceedings

MetPlant 2011

Conference Proceedings

MetPlant 2011

PDF Add to cart

In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc's Pirquitas mine in the north western Jujuy province of Argentina._x000D_
Testing of the ore at coarse feeds of between 2 and 12mm returned probable recoveries of up to a total of 95% silver into 50% of the mass fed to the InLine Pressure Jigs (IPJ's)._x000D_
The plant has been designed and built based on the test results to include a preparation screen to bypass the fines that are naturally higher in grade and repulping of the coarse which is then pumped to three parallel trains of 2-stage IPJ roughing-scavenging._x000D_
The target 50% yield to concentrate passes over a dewatering screen and the solids are returned back to the mill feed conveyor._x000D_
The IPJ tails are transferred to a dewatering screen and solid rejects are stockpiled off the end of a transfer conveyor._x000D_
All dewatered underflow products are processed via hydrocyclones to recover dirty water for use back into the IPJ circuit and return entrained fines to the fines bypass line.With the sulphide orebody being processed, the results from operations to date have shown that plant performance is matching the original laboratory sulphide ore testwork data. The objective of the pre-concentration step is to both reject gangue and achieve grades between 300-400g/t Ag to the float circuit as flotation recoveries are maximised within this range. The plant currently achieves overall upgrades of approximately 150% of feed grade with the IPJ only circuit producing an average 180% increase from calculated feed grade._x000D_
FORMAL CITATION:Gray, A H, Delemontex, G, Grigg, N and Yeomans, T, 2011. In-line pressure jig preconcentration plant at Pirquitas Mine, in Proceedings MetPlant 2011, pp 138-154 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine
    PDF
    This product is exclusive to Digital library subscription
  • In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 3.513 Mb.
  • Unique ID: P201107013

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.