Skip to main content
Conference Proceedings

MetPlant 2011

Conference Proceedings

MetPlant 2011

PDF Add to cart

The Casposo Gold-Silver Project - Process Selection and Design

Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphides in the ore. Casposo is a typical low sulphidation epithermal style gold-silver deposit where mineralisation is hosted within rhyolite - andesite flows and breccias. Veins are typically banded quartz-chalcedony colloform - crustiform banded with quartz - carbonate infill. Mineralisation is associated with an assemblage consisting of quartz, chalcedony, adularia, calcite, illite, sericite and trace sulphides. Gold and silver occur as electrum, native silver, sulfosalts and silver sulphides. This paper presents a case study that describes the process selection, development and engineering of a tailored process plant for the recovery of gold and silver from this ore.The original feasibility study, modelling, metallurgical testwork and engineering studies are outlined. The final flowsheet was based on minimising capital cost, operability, recovery and minimising technical risk.The process flowsheet uses the traditional Merrill Crowe route because of the high silver to gold ratio in the feed and achieves maximum gold and silver recovery while providing a common facility for future ore body treatment._x000D_
FORMAL CITATION:Connelly, D and Nilsson, K, 2011. The Casposo gold-silver project - process selection and design, in Proceedings MetPlant 2011, pp 536-551 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • The Casposo Gold-Silver Project - Process Selection and Design
    PDF
    This product is exclusive to Digital library subscription
  • The Casposo Gold-Silver Project - Process Selection and Design
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 1.145 Mb.
  • Unique ID: P201107041

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.