Skip to main content
Conference Proceedings

MetPlant 2019

Conference Proceedings

MetPlant 2019

PDF Add to cart

Optimising Gold Recovery through Staged Oxygen Addition at Newmont Goldcorp Boddington

The Newmont Boddington Gold plant includes three leach circuits treating the flotation tailings. One circuit pre-treats the fine and pyrrhotite-rich cleaner scavenger tails and two parallel circuits treat the scavenger tails and cleaner scavenger tails leach residue. Through ongoing test work an opportunity to increase gold recovery using staged oxygen addition was identified. Further test work determined the magnitude of the opportunity, some of the barriers to realising the opportunity and input parameters for the project design. This project modified the existing oxygenation devices, added additional oxygenation devices into the system and increased liquid oxygen storage and vaporisation capacity. This paper outlines the staged oxygen addition project from identification through to commissioning and discusses the initial benefits achieved.
CITATION:Petrucci, P, 2019. Optimising Gold Recovery through Staged Oxygen Addition at Newmont Goldcorp Boddington, in Proceedings MetPlant 2019, pp 248260 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Optimising Gold Recovery through Staged Oxygen Addition at Newmont Goldcorp Boddington
    PDF
    This product is exclusive to Digital library subscription
  • Optimising Gold Recovery through Staged Oxygen Addition at Newmont Goldcorp Boddington
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2018
  • PDF Size: 1.051 Mb.
  • Unique ID: p201905019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.