The Design And Operation Of The Cemented Hydraulic Fill Station Mount ISA Mines Limited

Design of the new cemented hydraulic fill plant was based mainly on experience with a succession of previous fill plants. Two stage cycloning of combined concentrator tailings was introduced. Design of the two stage cyclone configuration was assisted by computer simulation of cyclone performance. Cementing additives, namely Portland cement and ground copper reverberatory furnace slag, drawn from bulk storage, are pre-slurried prior to mixing with hydraulic fill. Quality control of fill being sent under- ground is achieved by a series of automatic control loops. Plant instrumentation was given prime consideration during the design phase._x000D_
Inventory checks of all mass flow metering equipment are made at regular intervals. Fill is pumped to boreholes at several locations. Details of the equipment and operating procedures for the plant are Discussed.
Return to parent product
  • The Design And Operation Of The Cemented Hydraulic Fill Station Mount ISA Mines Limited
    PDF
    This product is exclusive to Digital library subscription
  • The Design And Operation Of The Cemented Hydraulic Fill Station Mount ISA Mines Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1972
  • PDF Size: 0.306 Mb.
  • Unique ID: P197302020

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.