Skip to main content
Conference Proceedings

Mine Filling, North West Queensland

Conference Proceedings

Mine Filling, North West Queensland

PDF Add to cart

The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia

This paper examines the various stages of development and design work which were necessary to develop the cemented rock fill system for copper mining at Mount Isa. The reason for a cemented sand fill development program together with details of the test work undertaken are briefly outlined._x000D_
The testwork associated with the selection of a suitable local rock to supple- ment the cemented hydraulic fill is discussed, as is the method for underground placement and mixing of the graded rock with the cemented hydraulic fill. The design features of the final system which incorporates a graded rock handling system and a cemented hydraulic fill reticula- tion system is outlined.
Return to parent product
  • The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia
    PDF
    This product is exclusive to Digital library subscription
  • The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1972
  • PDF Size: 0.775 Mb.
  • Unique ID: P197302022

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.