Skip to main content
Conference Proceedings

Mine to Mill Conference, Brisbane, Qld, October 1998

Conference Proceedings

Mine to Mill Conference, Brisbane, Qld, October 1998

Add to cart

Papers in collection

  • A New Approach for Prediction of Blast Induced Coal Fragmentation Go to Paper
  • A Strategy to Minimise Ore Grade Reconciliation Problems Between the Mine and the Mill Go to Paper
  • Assessing the Risk of Incorrect Prediction - A Nickel/Cobalt Case Study Go to Paper
  • Blast Manipulation or Crusher Modification? Go to Paper
  • Blasting for Reduced Process Plant Costs at Argyle Diamond Mine Go to Paper
  • Computer Based Project Tools Go to Paper
  • Dynamic Simulation of Size Reduction Operations from Mine to Mill Go to Paper
  • Economic Loss Fucnctions and Geostatistical Simulation for Grade Control Applications Go to Paper
  • Economic Optimisation of the Blasting-Crushing-Grinding Comminution Process in a Low-Grade iron Ore (Taconite) Operation Go to Paper
  • Exploring the Effect of Blast Design on SAG Mill Throughput at KCGM Go to Paper
  • Implementation of Split to Estimate the Size Distribution of Rocks in Mining and Milling Operations Go to Paper
  • Improving Low-Grade Ore Recovery with the use of Efficient Blasting Techniques Go to Paper
  • Lessons from Manufacturing-Integrating Mining and Milling for a Complex Orebody Go to Paper
  • Managing Fines Generation in the Blasting and Crushing Operation at Cerro Colorado Mine Go to Paper
  • Metallurgical Characterisation of George Fisher Ore Textures and Implications for Ore Processing Go to Paper
  • Mine Production Scheduling with Linear Programming - Development of a Practical Tool Go to Paper
  • Mineralogical and Metallurgical Examination of Fluorosilicate Mineral Flotation in the Ok Tedi Circuit Go to Paper
  • Mineralogy Controlling Metallurgy at Ernest Henry Mining Go to Paper
  • Modern Management Systems for Higher Margins Go to Paper
  • One Character Effects on Copper Heap Leach Management Go to Paper
  • Optimising Coal Seam Preparation Operations with Dozers - an Important Phase in the Mine to Mill Chain Go to Paper
  • Optimum Drill and Blast Go to Paper
  • Prediction and Measurement of Size Distributions from Coal Mine to Coke Oven Go to Paper
  • Shrinking Assets: Recovery Compared to In Situ Estimation Go to Paper
  • Structure of the Integrated Mine Control System at Kemi Chrome Mine Go to Paper
  • Systhesis of Stochastic Recovery Prediction Cut-off Optimisation Go to Paper
  • The Assessment and Management of Coal Recovery in Open Pit Mines Go to Paper
  • The Effect of Blast Design on the Lump:Fines Ration at Marandoo Iron Ore Operations Go to Paper
  • The Effect of Run-of-Mine Constituents on the Anodic Depolarisation of Sulphur Dioxide During Copper Electrowinning Go to Paper
  • The Effects of Ore Petrology on Downstream Processing Performance: A Review Go to Paper
  • The Myth of Mine Reconciliation Go to Paper
  • Tracking Coal Fragmentation from Pit Face to Plant Feed Go to Paper
  • Tracking Hardness and Size: Measuring and Monitoring ROM Ore Properties at Highland Valley Copper Go to Paper
  • Using Simulation to Assess the Impact of Improvements in Drill and Blast on Down Stream Processes Go to Paper
PD Hours
Approved activity
  • Published: 1998
  • Unique ID: PA-199804

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.