Skip to main content
Conference Proceedings

Preconcentration Digital Conference 2020

Conference Proceedings

Preconcentration Digital Conference 2020

PDF Add to cart

A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

Grade Engineering, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection in the mine can significantly improve mineral head grades and overall productivity. A highly successful example is described at the Minera San Cristóbal (MSC) operation. The nature of the mineralisation in their “intrusive” ore domains in particular has facilitated high rejection rates (75 % of the mass), with significant upgrading of metal to the “accepts” streams (equating to a 2.6 times upgrade in the intrinsic Nett Smelter Return). Results from a series of production trials have confirmed these strong upgrades, resulting in the transformation of mineralised “marginal wastes” to high grade ore feedstocks.
If new approaches to more energy and water efficient comminution and separation technologies can also realise gangue rejection at finer sizes in the concentrator, then preconcentration strategies across the value chain also offer the promise of no wet tailings treatment facilities and greatly reduced volumes of waste streams.
This “No Tails” strategy is discussed, along with the integrated technologies needed to realise its effect. The work suggests a pathway and insights of a sustainable future for the Minerals Industry, unconstrained by Energy and Water, along with no requirement to produce problematic disposal streams. This strategy has the potential to significantly reposition the social, environmental, financial, and regulatory context of existing and new mining opportunities.
Return to parent product
  • A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’
    PDF
    This product is exclusive to Digital library subscription
  • A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2020
  • Pages: 13
  • PDF Size: 4.38 Mb.
  • Unique ID: P-01459-S1X0C7

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.