Skip to main content
Conference Proceedings

Reliability Production and Control in Coal Mines, Wollongong, September 1991

Conference Proceedings

Reliability Production and Control in Coal Mines, Wollongong, September 1991

PDF Add to cart

Automation and Control of Longwall Mining Systems

The past 20 years have seen the replacement of hydraulic control of longwall mining systems by the neater. smaller and better controlled electronic units._x000D_
Early problems of moisture and other effects on reliability were overcome to see electronically controlled supports chosen for Corrimal Colliery ten years ago. Lessons from Corrimal and elsewhere, with following improvements and sophistication led to wider use as exemplified by Meco and other electronically controlled supports used in more recent installations in New South Wales, Queensland, USA and Czechoslovakia of the total of over 80 electronically controlled support installations worldwide in the past decade. Present work is toward a fully "integrated face" of British Coal by 1993, incorporating the Meco automatic face straightening system already due for practical use in the UK later this year. However the manless face still appears to be some way off although the present minimum crews and close monitoring, including early warning, are promising stages.
Return to parent product
  • Automation and Control of Longwall Mining Systems
    PDF
    This product is exclusive to Digital library subscription
  • Automation and Control of Longwall Mining Systems
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1990
  • PDF Size: 0.333 Mb.
  • Unique ID: P199106008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.