Skip to main content
Conference Proceedings

Reliability Production and Control in Coal Mines, Wollongong, September 1991

Conference Proceedings

Reliability Production and Control in Coal Mines, Wollongong, September 1991

PDF Add to cart

The Use of Integrated Exploration Techniques to Improve Geological Reliability of Longwalls and their Development Roads

The exploration methods used by the British Coal Corporation in 1990 improve the geological reliability of underground coal production. Although some of the techniques in common use have been proved to be effective, their limitations are recognised and concentration has been on the increasing integration of direct and remote sensing techniques. Attention is focussed onto first seam workings in sections of at least 2 metres in the depth range of 400- 1200 metres and covers both surface and underground exploration._x000D_
The case studies of exploration techniques and their effect on mine design at several existing collieries are representative of a wide range of geological environments within the more productive British coalfields. Notwithstanding such improvements in exploration and geological reliability, further new exploration technology is currently being investigated or trialled by British Coal.
Return to parent product
  • The Use of Integrated Exploration Techniques to Improve Geological Reliability of Longwalls and their Development Roads
    PDF
    This product is exclusive to Digital library subscription
  • The Use of Integrated Exploration Techniques to Improve Geological Reliability of Longwalls and their Development Roads
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1990
  • PDF Size: 0.159 Mb.
  • Unique ID: P199106058

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.