Skip to main content
Conference Proceedings

Sixth International Mining Geology Conference

Conference Proceedings

Sixth International Mining Geology Conference

PDF Add to cart

Modelling the Initial Pit Design - The First Step for Project Valuation

One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal prices and production costs. Consequently, the estimation of the recoverable reserves needs to be done based on a fixed break-even cut-off grade (BECG), in which fixed expected metal prices and production costs are assumed throughout the operating life of the mine (OLM)._x000D_
In this paper, an alternative technique for estimating the recoverable reserves of an open pit mining project is presented and explained in detail. The main characteristic of this technique is that it estimates the recoverable reserves of the project using mining costs as reference: this is done due to the fact that mining costs are easier to model than metal prices. Another important characteristic of this technique is that it uses the uncertainty of the geology of the orebody, given by simulations of the deposit, to make final strategic decisions, such as the selection of the operating life of the mine and the optimal production rate, which minimise the risk of not achieving future production targets while maximising the upside potential of future rewards._x000D_
As it will be shown, the final outcome of the proposed technique is the generation of a robust open pit design, that include cutbacks and ultimate pit limits, called the marginal open pit mine design (MOPMD). One characteristic of the MOPMD is that, at each production period, it will be characterised by their respective geological uncertainty, given as probability distributions of ore, waste and metal quantities, and by marginal economical project indicators, such as cut-off grades and metal prices, among others. The details follow in the paper._x000D_
FORMAL CITATION:Martnez, L and Wolff, R, 2006. Modelling the initial pit design - the first step for project valuation, in Proceedings Sixth International Mining Geology Conference, pp 269-282 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Modelling the Initial Pit Design - The First Step for Project Valuation
    PDF
    This product is exclusive to Digital library subscription
  • Modelling the Initial Pit Design - The First Step for Project Valuation
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2005
  • PDF Size: 0.729 Mb.
  • Unique ID: P200606030

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.