Skip to main content
Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

PDF Add to cart

A case study of blending-based cut-off selection in an open pit iron ore mine

The determination of the cut-off grade and pit optimisation are fundamental steps in open pit mine planning, as they define the economic limits of the deposit and influence the mining scheduling. Traditional optimisation methods, such as the Lerchs–Grossmann algorithm, are based on the individual economic evaluation of blocks, considering the difference between revenues and costs. However, this approach presents limitations in iron ore deposits, in which the value of the material depends on the final product quality, often obtained through blending. This paper presents a case study for defining the cut-off grade for deposits with these characteristics, incorporating blending into the pit optimisation process and, ultimately, into mine planning and scheduling. The approach considers the cut-off grade as the result of an integrated process involving geological, operational, and economic factors. The study presents a comparative analysis between the traditional method, which is defined as base case, and an approach based on blending scenarios, evaluating impacts on profitability, product quality, and mineral resources utilisation. The methodology involves defining incremental cut-off grade scenarios between 38 per cent and 45 per cent Fe grade, followed by block valuation, pit optimisation, pushback definition, and mining scheduling. For each scenario, economic modelling was carried out with revenue estimates based on market indices (Platts) and the Freight on board (FOB) netback market pricing formula, in addition to cash flow and net present value (NPV) calculation. The study was applied to the Pau Branco Mine, in the Quadrilátero Ferrífero (MG), characterised by banded iron formations and high variability of grades. Two alternatives were tested for each scenario: a capacity-constrained case, considering plant throughput limits, and a production-maximisation case that maintained the same life-of-mine while assuming no processing capacity constraints.
Return to parent product
  • A case study of blending-based cut-off selection in an open pit iron ore mine
    PDF
    This product is exclusive to Digital library subscription
  • A case study of blending-based cut-off selection in an open pit iron ore mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 18
  • PDF Size: 0.63 Mb.
  • Unique ID: P-05704-B3Q3P3

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.