Skip to main content
Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

PDF Add to cart

A stochastic economic block-model framework for optimising underground stope layouts under grade uncertainty for a platinum-group-element deposit

Underground stope-layout optimisation is usually carried out on a single, smoothed estimate of grade, typically an ordinary-kriging block model. Grade is, however, uncertain, and that uncertainty can be represented by an ensemble of equally likely conditional simulations. This paper asks a direct question: when, and by how much, does optimising the stope layout on such an ensemble create more economic value than optimising on one kriged estimate? We build a known synthetic reference panel calibrated to the Platreef, a platinum-group-element deposit, sample it with drill holes, and from those samples build both an ordinary-kriging model and a 50-realisation sequential-Gaussiansimulation ensemble. Every candidate stope layout is valued on the known reference, so the economic value captured is measured rather than assumed. Using economic parameters from the Platreef 2025 Integrated Development Plan with a break-even grade of 1.64 g/t 3PGE+Au (platinum, palladium and rhodium plus gold), three results emerge. Firstly, for a linear mining decision in which the entire stope is mined, the simulation mean and the kriged estimates are close enough, indicating no material advantage. For the linear objective, the optimal decision depends only on the conditional expected value, which kriging already estimates. Secondly, for a non-linear decision in which the stope is developed and sent to either the mill or waste dump according to its bulk grade, optimising on the ensemble recovers up to 22.5 per cent more realised value at selective cut-offs under a develop-and-destination decision, because it credits marginal stopes with a real chance of being ore; the gain is positive across the ensemble at cut-offs up to 4.0 g/t, not only on the reference. Lastly, block (selective mining unit) support matters: coarsening the model lowers grade dispersion and the achievable value through the volume-variance effect, and the economically optimal stope size is governed by development cost rather than by geology alone. When the risk of the entire stope layout is optimised globally rather than stope-by-stope, the risk-return frontier is modest, because stopelevel risks diversify across the layout. This paper extends a previous deterministic dual-interchangealgorithm study by incorporating grade uncertainty and complements a stochastic stope-design framework by incorporating development costs.
Return to parent product
  • A stochastic economic block-model framework for optimising underground stope layouts under grade uncertainty for a platinum-group-element deposit
    PDF
    This product is exclusive to Digital library subscription
  • A stochastic economic block-model framework for optimising underground stope layouts under grade uncertainty for a platinum-group-element deposit
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 14
  • PDF Size: 1.769 Mb.
  • Unique ID: P-05747-R5B3H9

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.