Assessing strategic production schedules of mining complexes and project evaluation impacts relating to uncertainty
Mining project valuation is fundamentally dependent on the ability to extract, blend and deliver ore products that consistently meet market specifications over the life-of-mine. In iron ore mining complexes, where multiple open pits feed integrated processing and logistics systems, production outcomes are governed by complex interactions between geological variability, operational constraints and market conditions. Suboptimal sequencing decisions can lead to degradation in product quality, inefficient utilisation of capacity and ultimately reduced project value. Conventional long-term mine planning approaches rely on deterministic orebody models and sequential optimisation workflows. These methods simplify the spatial variability and uncertainty inherent in mineral deposits and typically optimise components of the mining value chain in isolation. Consequently, the resulting production schedules often fail to represent the true distribution of material properties and are exposed to supply risks arising from geological uncertainty. In addition, the treatment of commodity prices through fixed assumptions or subjective scenarios introduces further exposure to demand uncertainty, limiting the robustness of project evaluations. Recent developments in stochastic optimisation enable simultaneous consideration of multiple equiprobable realisations of geological and market conditions. By integrating these uncertainties directly into the optimisation process, it is possible to generate production schedules that better reflect the range of outcomes likely to be encountered during mining and improve the reliability of valuation metrics. This study examines the impact of incorporating both geological and commodity price uncertainty into the optimisation of a Pilbara iron ore mining complex. Production schedules generated using a deterministic optimisation workflow are compared against those obtained from a simultaneous stochastic optimisation framework, with a focus on value, risk and operational practicality. A mining sequence and cut-off grade strategy that is practical in execution achieved a net present value approximately 20 per cent greater than that of the deterministic sequence with significant up-side potential was generated using the stochastic framework.
Contributor(s):
W Patton, B Marriott
-
SubscribeAssessing strategic production schedules of mining complexes and project evaluation impacts relating to uncertaintyPDFThis product is exclusive to Digital library subscription
-
Add to cartAssessing strategic production schedules of mining complexes and project evaluation impacts relating to uncertaintyPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 8
- PDF Size: 1.679 Mb.
- Unique ID: P-05726-Q3M4C0