Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Assessing the impact of nonlinear combinations from the geometallurgical models and geological uncertainty within the strategic mine planning
Strategic mine planning production forecasts and economic outcomes depend on spatial distribution of grades and contacts between different ore types, complex recovery functions, cut-off policies governing flows to multiple destinations, product specifications, and other operational constraints. Conventional mine planning techniques often misrepresent ore tonnages, metal production, recovery performance, and financial outcomes, leading to poor reconciliation between forecasts and actuals. This limitation arises because these approaches typically rely on single, smoothed estimated resource models, which are unable to adequately integrate geological uncertainty and variability, or to capture the non-linear relationships inherent in recovery estimations. This study evaluates the impact of geological uncertainty and recovery non-linearity on mine planning performance in a gold deposit characterised by sulfide and oxide mineralisation. A set of equiprobable joint geostatistical simulations of multiple grades and material types was generated to capture spatial variability and correlations. Using these simulations, a three-step methodology was implemented. First, these simulations were used to perform a risk analysis of a deterministic mine plan. Second, a stochastic mine plan was developed using a two-stage simultaneous optimisation framework. Finally, both deterministic and stochastic models were reconciled against grade control data using F1 factors, enabling the quantification of deviations in ore tonnage, metal content, recovery and production estimates. The risk analysis of the deterministic plan indicates a production risk with a P50 = -5.9 per cent in the life-of-mine, while recoveries are underestimated due to uncertainty in lithological contacts, resulting in significant production risks. This overestimation in production generates a cash flow risk of, in average, -13.6 per cent when compared with the deterministic value. In contrast, stochastic optimisation demonstrates the potential to increase expected net present value (NPV) by up to 10.7 per cent, primarily through improved sequencing decisions, an alternative optimised cut-off grade policy, that account for uncertainty and non-linear recovery behaviour. Comparison against grade control data further highlights differences between deterministic and simulated models. While average grades are relatively close for all the models, the application of recovery functions, economic parameters, and cut-off policies significantly amplifies discrepancies. The deterministic model underestimates recoveries, presenting an F1 factor of 87.0 per cent, while simulations show a better representation, ranging from 105.9 per cent to 107.1 per cent. Recovery factors vary between from 101.4 per cent to 101.8 per cent for simulations and 104.2 per cent for the deterministic model. These results demonstrate that the improvements achieved through stochastic optimisation are directly linked to a more realistic representation of geological variability and uncertainty. Incorporating these factors into strategic mine planning enhances forecast reliability, supports better decision-making, and ultimately maximises project value.
Contributor(s):
G Gariba, D Alegre, M Faria, A Mayrink, L C, rade, R Peroni, J L V Mariz
-
SubscribeAssessing the impact of nonlinear combinations from the geometallurgical models and geological uncertainty within the strategic mine planningPDFThis product is exclusive to Digital library subscription
-
Add to cartAssessing the impact of nonlinear combinations from the geometallurgical models and geological uncertainty within the strategic mine planningPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 10
- PDF Size: 0.422 Mb.
- Unique ID: P-05716-X9B4K5